Note: Due to their large size, a number of the documents will not open immediately within a new tab. Viewers may get an Adobe icon image upon selecting the document. In those instances, please 1) download the file, 2) open Adobe Acrobat/Reader, and 3) open the downloaded file directly from Adobe Acrobat/Reader.
|
Document Title |
Date Added |
Portsmouth Surveillance & Maintenance |
X-611A Burn Plan | 1/5/2022 |
Integrated S&M Plan for Portsmouth | 1/5/2022 |
Paducah Surveillance & Maintenance |
C-208 Firing Range Warranty | 1/5/2022 |
Paducah Rail Info | 1/5/2022 |
FRNP-21-4911 Deliverable No. 149—2021 Annual Roof Integrity Assessment FRNP, PGDP Deactivation and Remediation Project | 3/7/2022 |
6098OC Dept of Energy Warranty | 3/7/2022 |
6206OC Dept. of Energy Warranty | 3/7/2022 |
FRNP-20-3310 Annual Roof Integrity Report 2019 | 3/7/2022 |
CP2-SM-0001 FR1A Surveillance and Maintenance Program Plan | 5/17/2022 |
Paducah Utilities |
PGDP Utility Descriptions | 1/5/2022 |
Utility System Health Information | 1/5/2022 |
Sewer Study | 1/5/2022 |
Package Boiler Drawings | 5/17/2022 |
Utilities Demarcation Narrative | 3/7/2022 |
PSM System Health Qtr 1-22 | 2/1/2022 |
Electrical Sys Health Qtr 2-22 | 6/23/2022 |
FWS System Health Qtr 2-22 | 6/23/2022 |
PSM System Health Qtr 2-22 | 6/23/2022 |
HPFW System Health Qtr 1-22 | 6/23/2022 |
Utilities System Health Qtr 2-22 | 6/23/2022 |
Portsmouth Utilities |
X-690 Steam Plant Work Plan | 1/5/2022 |
X-690 FCN to Work Plan | 1/5/2022 |
FY21 Utility Metrics | 1/5/2022 |
Portsmouth Gas Billing | 1/5/2022 |
OSWDF Sewage Meter Readings | 1/5/2022 |
Utility Operations Distribution Report | 1/5/2022 |
Portsmouth Programmatic |
TSCA Approval for Storage for Disposal of PCB Bulk Product | 1/5/2022 |
Ohio Title V Permit | 1/5/2022 |
Ohio NPDES Permit | 1/5/2022 |
O&M Plan and Surface Water Rad Sampling | 1/5/2022 |
OEPA Water Treatment Strategy Design | 1/5/2022 |
OEPA X-611B Update | 1/5/2022 |
Wastewater Treatment System PSVP and RTCs | 1/5/2022 |
Wastewater Treatment System PSVP Phase I | 1/5/2022 |
TCE Plume Map | 1/5/2022 |
Radionuclide Emissions Report CY20 | 1/5/2022 |
List of NPDES Outfalls | 1/5/2022 |
2016 06-23 EVAL-SE-2016-0238, Rev. 0 Operation of the CAAS | 5/17/2022 |
FBP-NSE-AA-00001 Rev 3 FUEF and Non-FUEF Authorization Agreement (PPPO-03-10008097) | 5/17/2022 |
Paducah Programmatic |
Paducah Solid Waste Permit | 1/5/2022 |
Paducah KPDES Permit | 1/5/2022 |
D&R Title V Permit | 1/5/2022 |
PPPO IT Strategic Plan | 1/5/2022 |
Site Interface Process | 1/5/2022 |
SWMU Map | 1/5/2022 |
EM Program Management Protocol | 1/5/2022 |
PGDP Site Map | 1/5/2022 |
DOE-PACRO Asset Transition Agreement | 1/5/2022 |
Kentucky Department of Fish and Wildlife License Agreement | 1/5/2022 |
Best Management Practices Plan | 1/5/2022 |
TSCA FFCA | 1/5/2022 |
KDWM Hazardous Waste Permit | 1/5/2022 |
FY22 Site Management Plan | 1/5/2022 |
Facility Response Plan | 1/5/2022 |
Cultural Resources Management Plan | 1/5/2022 |
EMP 2021 | 1/5/2022 |
PGDP Facility Background Info Part 1 | 1/5/2022 |
PGDP Facility Background Info Part 2 | 1/5/2022 |
Cultural Resources Survey | 1/5/2022 |
DUF6 Air Permit | 1/5/2022 |
CP2-QA-1000 FR3 Quality Assurance Program Description | 5/17/2022 |
CP2-QA-3000 FR3 Contractor Performance Assurance Program Description at PGDP | 5/17/2022 |
Contractor Human Resources Management |
FBP PLA 091718 Rv Rates COVID MOU | 1/24/2022 |
FBP SPFPA 021017-093021 CBA MOA Ext | 1/24/2022 |
FBP USW D&D Contract Extension | 1/24/2022 |
FBP-USW PTU CBA 2017- 2022 with MOU-MOAs | 1/24/2022 |
FRNP SPFPA 120519-061922 | 1/24/2022 |
FRNP USW 082119-061922 MOA | 1/24/2022 |
MCS USW Pad MOU COVID-19 Holiday Pay 2020 | 1/24/2022 |
MCS USW Port 020117-013122 & MOA |
1/24/2022 |
SSI USW 020518-093020 & MOA Extension | 5/17/2022 |
WEMS-USW CBA 01-18-11 to 3-16-15 | 5/17/2022 |
MCS USW Port 120117-013122 wMOUs | 5/17/2022 |
MCS USW Pad CBA 121318-020122 wMOUs | 5/17/2022 |
FBP USW Career HRA Plan & SPD Amendment 010120 | 6/21/2022 |
FBP USW Career Pension Plan SPD 010118 | 6/21/2022 |
FRNP USW Career Pension Plan for App. A USW-Rep EEs SPD 010118 | 6/21/2022 |
FRNP USW HRA plan doc and SPD | 6/21/2022 |
MCS 2022 PPO200, PPO500, HSA3000 Certificate of Coverage | 6/21/2022 |
MCS DUF6 Pension Summary Plan Description - Pension | 6/21/2022 |
DUF6 Operations |
Technical and Regulatory Evaluation of Heel Size | 1/24/2022 |
Operator Round Sheets for Facility Support | 1/25/2022 |
Facility Manager Checklist | 1/25/2022 |
PORTS DUF6 Operator Round Sheets Instructions | 1/25/2022 |
DOE 48-Inch Diameter & CV UF6 Cylinder Inspection/Maintenance Checksheet and Instructions | 1/25/2022 |
Monthly UF6 Cylinder Storage Yard Inspection Sheet | 1/25/2022 |
Paducah DUF6 Daily Orders | 1/25/2022 |
Plan of the Day | 1/25/2022 |
Paducah Cylinder Storage Yard Facility Manager Daily Log | 1/25/2022 |
PADUCAH CONVERSION Facility Manager and Supervisor Turnover Checklist | 1/25/2022 |
X-1300 Operations Control Room Log | 1/25/2022 |
DUF6 Paducah Facility Manager Narrative Log | 1/25/2022 |
KPDES Permit No KY0004049 Request to Modify the Cooling Tower Water Treatment Additive_10.8.15 | 1/25/2022 |
Inspection Criteria for Modified/Oxide Cylinders | 1/25/2022 |
Handling and Transportation of Empty, Modified, and Heel Cylinders | 1/25/2022 |
Empty Railcar Return/Receipt Inspection Checklist | 1/25/2022 |
Railcar Inspection After Loadout/Off-Site Shipment Checklist | 1/25/2022 |
Vaporization Room Operation Mode Checklist | 1/25/2022 |
Cylinder Evacuation Room Operation Mode Checklist | 1/25/2022 |
Scrubber Room Operation Mode Checklist | 1/25/2022 |
HF Sampling Checklist | 1/25/2022 |
HF LOADOUT RAILCAR CHECKLIST | 1/25/2022 |
Paducah Plant Shiftly Operator Round Sheet Signature Page | 1/25/2022 |
Paducah Plant Weekly Operator Round Sheet | 1/25/2022 |
Paducah Plant Miscellaneous Operator Round Sheet | 1/25/2022 |
Paducah Production Support Daily Operator Round Sheet | 1/25/2022 |
C-1100 Administration Building EAP | 1/25/2022 |
C-1300 Conversion Building EAP | 1/25/2022 |
C-1700 Warehouse EAP | 1/25/2022 |
DUF6 Plant Electrical System Portsmouth and Paducah Plants | 1/25/2022 |
HF Storage System | 1/25/2022 |
Closed Cooling Water System | 1/25/2022 |
Process Chilled Water System | 1/25/2022 |
Project Management Plan | 1/25/2022 |
Regulatory and Permitting Management Plan | 1/25/2022 |
Project Quality Assurance Plan | 1/25/2022 |
Waste Management Plan | 1/25/2022 |
Radiation Protection Program | 1/25/2022 |
Conversion Facilities Operations and Maintenance Plan | 1/25/2022 |
Records Management Plan | 1/25/2022 |
Risk Management Plan | 1/25/2022 |
Fire Protection Program Description for the DUF6 Conversion Project | 1/25/2022 |
Personnel Selection, Training, and Qualification Management Plan | 1/25/2022 |
POLLUTION PREVENTION AND WASTE MINIMIZATION (P2WM) PLAN | 1/25/2022 |
Integrated Safety Management System Plan | 1/25/2022 |
Sampling And Analysis Plan | 1/25/2022 |
Waste Certification Program Plan | 1/25/2022 |
Maintenance Implementation Plan | 1/25/2022 |
Worker Safety and Health Program | 1/25/2022 |
HF Disposition, OSHA Process Safety Management, and EPA Risk Management Plan | 1/25/2022 |
Paducah Storm Water Pollution Prevention and Best Management Practices Plan | 1/25/2022 |
Piketon Storm Water Pollution Prevention and Best Management Practices Plan | 1/25/2022 |
Environmental Management System Plan | 1/25/2022 |
Configuration Management Plan for Operations | 1/25/2022 |
DUF6 Oversight Plan | 1/25/2022 |
DUF6 Contractor Assurance System Description | 1/25/2022 |
Nuclear Criticality Safety Program for the DUF6 Conversion Project | 1/25/2022 |
DUF6 Property Management Plan | 1/25/2022 |
System Requirements Document for the Overall Depleted Uranium Hexafluoride Conversion Project | 1/25/2022 |
C-1300 Operations Control Room Log | 1/25/2022 |
Safety Basis Documentation | 1/25/2022 |
System Walk Down Report | 1/25/2022 |
DUF6 Field Oversight Report | 1/25/2022 |
Storage Area Inspection Checklist | 1/25/2022 |
Oxide Storage Area(s) Inspection Checklist | 1/25/2022 |
Portsmouth Effluent Treatment System | 1/25/2022 |
Fire Protection and Detection System | 1/25/2022 |
Heating, Ventilation and Air Conditioning Systems | 1/25/2022 |
CONTRACT BETWEEN MID-AMERICA CONVERSION SERVICES, LLC Hereafter referred to as the “Company” or “MCS” And UNITED STEEL, PAPER AND FORESTRY, RUBBER, MANUFACTURING, ENERGY, ALLIED INDUSTRIAL AND SERVICE WORKERS INTERNATIONAL UNION, AFL-CIO AND ITS LOCAL 550 Hereinafter referred to as the “Union” or “USW” | 1/25/2022 |
CONTRACT BETWEEN MID-AMERICA CONVERSION SERVICES, LLC (MCS) PORTSMOUTH GASEOUS DIFFUSION PLANT and UNITED STEELWORKERS, AFL‐CIO On Behalf of USW Local No. 689‐03 | 1/25/2022 |
Director's Final Findings & Orders - 3/28/2011 | 1/25/2022 |
Director's Final Findings & Orders - 10/1/2013 | 1/25/2022 |
Air Liquide General Services Agreement - Amendment Number 1 | 1/25/2022 |
Air Liquide Industrial U.S. LP APSA Product Supply Agreement | 1/25/2022 |
Air Liquide Pad Amendment 1 - APSA Product Supply Agreement Dated - 7/2/2007 | 1/25/2022 |
Air Liquide Ports - APSA Product Supply Agreement Dated - 11/22/2006 | 1/25/2022 |
Air Liquide Ports Amendment 1 - APSA Product Supply Agreement Dated - 1/1/2007 | 1/25/2022 |
AUTHORIZED LIMITS FOR UNRESTRICTED RELEASE OF CAF2 - 09/28/18 | 1/25/2022 |
CID DUF6 Inventory Run - 3/23/21 | 1/25/2022 |
Commonwealth of Kentucky Agreed Order | 1/25/2022 |
2020 Portsmouth and Paducah Tennessee Applications for Radioactive Waste License-For-Delivery | 1/25/2022 |
Application for Utah Generator Site Access Permit Renewal - 07/21/20 | 1/25/2022 |
Paducah Air Permit Renewal Application - 09/02/2020 | 1/25/2022 |
Paducah Hazardous Waste Activity Renewal Registration - 02/01/2021 | 1/25/2022 |
Portsmouth and Paducah - List of Facilities - 7/20/21 | 1/25/2022 |
Paducah Conversion Building General Arrangement - Mechanical, Electrical Rm and Misc. Area | 1/25/2022 |
Paducah Conversion Building General Arrangement - HF Scrubber Room | 1/25/2022 |
Paducah Conversion Building General Arrangement - Roof Plan | 1/25/2022 |
DUF6 Cylinder Data Form 1358 | 1/25/2022 |
Portsmouth DFF&O Cooling Water Chemical Modification Request | 1/25/2022 |
Update to OEPA Form 9029 RCRA Subtitle C Site Identification - 02/11/14 | 1/25/2022 |
KPDES Permit No KY0004049 Request to Modify the Cooling Tower Water Treatment Additive - 10/8/15 | 1/25/2022 |
DUF6 Cylinder Pre-Heat/Pre-Shipping Inspection Form | 1/25/2022 |
DUF6 Cylinder Moving Through Conversion Process to Storage Procedure | 1/25/2022 |
2016 Paducah Hazardous Waste Annual Report and Assessment Return - 02/28/17 | 1/25/2022 |
Paducah Hazardous Waste Activity Renewal Registration - 03/13/17 | 1/25/2022 |
Portsmouth NPDES Permit Renewal Application to OEPA - 11/16/18 | 1/25/2022 |
Paducah Hazardous Waste Activity Renewal Registration - 2/12/21 | 1/25/2022 |
Sales Agreement With Solvay - 5/24/2006 | 1/25/2022 |
In-Storage Inspection of 30” & 48” DOE UF6 Cylinders Procedure | 1/25/2022 |
Transporting Uranium Oxide Cylinders Procedure | 1/25/2022 |
DUF6 Cylinder Inspection Checklist | 1/25/2022 |
Inspection and Operation of UF6 Cylinder Handler or Straddle Carrier Procedure | 1/25/2022 |
Portsmouth UF6 Cylinder Surveillance and Maintenance Program Procedure | 1/25/2022 |
Portsmouth Conversion Building General Arrangement - Roof Plan | 1/25/2022 |
Portsmouth Conversion Building General Arrangement - Cylinder Transfer and Hot Shop | 1/25/2022 |
Director's Final Findings & Orders - 2/27/2008 | 1/25/2022 |
TSCA Approval for Storage for Disposal of PCB Bulk Product (Mixed) Waste - 06/09/05 | 1/25/2022 |
Director's Final Findings & Orders - 2/6/2017 | 1/25/2022 |
KYR-000-051-128 2021 Hazardous Waste Activity Renwal Certificate - SQG | 1/25/2022 |
Letter Agreement and Amendment No. 2 With Solvay | 1/25/2022 |
Letter to DNFSB - 10/16/1995 | 1/25/2022 |
Air Liquide - BWCS General Services Agreement Amendment Number 2 _Hydrogen Amendment | 1/25/2022 |
MCS Contract DE-EM0004559 Conformed (through Mod 0163) - 10/12/2021 | 1/25/2022 |
Metals Moratorium History and Status | 1/25/2022 |
Ohio EPA Permit No.: 01S00034*CD Final Effluent Limitations and Monitoring Requirements | 1/25/2022 |
Commonwealth of KY Energy and Environment Cabinet Division of Enforcement Case No. DOW 110191 Agreed Order | 1/25/2022 |
Ohio EPA Findings and Orders (approval for use of BD1500 and AF3561 in Cooling Tower) | 1/25/2022 |
Ohio EPA Directors Final Findings and Orders - 6/24/2005 | 1/25/2022 |
Operations Summary Table FY17-FY20 | 1/25/2022 |
MCS Org Chart as of 7/1/21 | 1/25/2022 |
Commonwealth of Kentucky Natural Resources and Environmental Protection Cabinet Agreed Order - 10/3/2003 | 1/25/2022 |
Air Liquide APSA Product Supply Agreement Amendment Number 2 | 1/25/2022 |
Radiological National Emission Standards for Hazardous Air Pollutants (NESHAP) 2019 Annual Report for the DOE Portsmouth Gaseous Diffusion Plant, Piketono Ohio | 1/25/2022 |
Final Air Pollution Permit-To-Install and Operate | 1/25/2022 |
Authorized Limits for Release of Off-Spec AqHF Generated During Startup Operations at the DUF6 Conversion Project in Portsmouth OH | 1/25/2022 |
SUBMITTAL OF THE NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR
POLLUTANTS ANNUAL REPORT FOR 2019 U.S. DOE RADIOLOGICAL EMISSIONS AT THE PADUCAH GASEOUS DIFFUSION PLANT, FRNP-RPT-0146 | 1/25/2022 |
SUBMITTAL OF THE NATIONAL EMISSIONS STANDARDS FOR HAZARDOUS AIR
POLLUTANTS ANNUAL REPORT FOR 2019 U.S. DOE RADIOLOGICAL EMISSIONS AT THE PADUCAH GASEOUS DIFFUSION PLANT, FRNP-RPT-0146 | 1/25/2022 |
National Emissions Standards for Hazardous Air Pollutants Radionuclide Emissions Report for CY19 for the DOE Portsmouth Gaseous Diffusion Plant, Piketon, Ohio | 1/25/2022 |
AIR LIQUIDE APSA PRODUCT SUPPLY AGREEMENT AMENDMENT NUMBER 2 | 1/25/2022 |
Release Limits for Hydrofluoric Acid and Calcium Flouride from DUF6 Conversion | 1/25/2022 |
Amendment 1 to Solvay Sales Agreement | 1/25/2022 |
Solvay UDS Sales Agreement 2006 signed | 1/25/2022 |
Tennessee Radioactive Waste License-for-Delivery for Paducah | 1/25/2022 |
Tennessee Radioactive Waste License-for-Delivery for Portsmouth | 1/25/2022 |
Generator Site Access Permit (#1107006880 for Paducah, KY) | 1/25/2022 |
Generator Site Access Permit (#1107006900 for Portsmouth, OH) | 1/25/2022 |
PADUCAH GROUNDWATER PROTECTION PLAN | 5/26/2022 |
Chain of Custody | 5/26/2022 |
ARS Aleut Analytical, LLC Laboratory Analytical Report ARS1-22-00264 | 5/26/2022 |
ARS Aleut Analytical, LLC Laboratory Analytical Report ARS1-22-00265 | 5/26/2022 |
BWCS Oxide to IBI | 5/26/2022 |
Paducah DUF6 Conversion Project Process Flow Diagram Hydrogen Supply System | 5/26/2022 |
Paducah DUF6 Conversion Project Piping and Instrumentation Diagram Hydrogen Supply System | 5/26/2022 |
Paducah DUF6 Conversion Project Piping and Instrumentation Diagram PHG250 Hydrogen Supply System | 5/26/2022 |
Paducah DUF6 Conversion Project 14.4KV SwitchGear One Line Diagram | 5/26/2022 |
Paducah DUF6 Conversion Project 480V UNIT SUBSTATIONS A1 AND A2 ONE LINE DIAGRAM | 5/26/2022 |
Paducah DUF6 Conversion Project 480V UNIT SUBSTATIONS B1 AND B2 ONE LINE DIAGRAM | 5/26/2022 |
Paducah DUF6 Conversion Project 480V MOTOR CONTROL CENTER A12 ONE LINE DIAGRAM | 5/26/2022 |
Paducah DUF6 Conversion Project 480V MOTOR CONTROL CENTER A22 ONE LINE DIAGRAM | 5/26/2022 |
Paducah DUF6 Conversion Project 480V MOTOR CONTROL CENTER A23 ONE LINE DIAGRAM | 5/26/2022 |
Paducah DUF6 Conversion Project 480V MOTOR CONTROL CENTER B12 ONE LINE DIAGRAM | 5/26/2022 |
Paducah DUF6 Conversion Project 480V MOTOR CONTROL CENTER B1 4E & B1 4EA ONE LINE DIAGRAM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT 480V MOTOR CONTROL CENTER B22 ONE LINE DIAGRAM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PDP-A1-2 AND PDP-A2-1 ONE LINE DIAGRAM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PROCESS FLOW DIAGRAM PROCESS CHILLED WATER SYSTEM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM POTABLE WATER SYSTEM SHEET 1 OF 2 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM POTABLE WATER SYSTEM SHEET 2 OF 2 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM SANITARY SEWER SYSTEM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM SERVICE WATER SYSTEM SHEET 1 OF 3 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM SERVICE WATER SYSTEM SHEET 2 OF 3 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM SERVICE WATER SYSTEM SHEET 3 OF 3 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT UPS ONE LINE DIAGRAM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM HVAC SYSTEM - ADMINISTRATION BUILDING SHEET 1 OF 3 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM HVAC SYSTEM - ADMINISTRATION BUILDING SHEET 2 OF 3 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM HVAC SYSTEM - ADMINISTRATION BUILDING SHEET 3 OF 3 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT RISER DIAGRAM ADMINISTRATION BUILDING POTABLE WATER SYSTEM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT ADMINISTRATION BUILDING UPS POWER PANEL MP-002-1 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CLOSED COOLING WATER SYSTEM | 5/26/2022 |
CYLINDER STABILIZATION SYSTEM P&ID HEEL STABILIZATION TABLE | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 1 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 2 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 3 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 4 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 5 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 6 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 7 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 8 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BLDG PROCESS AREA HVAC SYSTEM SHEET 9 OF 9 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM HVAC SYSTEM -CONVERSION BLDG OFFICE AREA SHEET 1 OF 2 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM HVAC SYSTEM -CONVERSION BLDG OFFICE AREA SHEET 2 OF 2 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BUILDING MISCELLANEOUS AREA HVAC SYSTEM SHEET 1 OF 4 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BUILDING MISCELLANEOUS AREA HVAC SYSTEM SHEET 2 OF 4 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BUILDING MISCELLANEOUS AREA HVAC SYSTEM SHEET 3 OF 4 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM CONVERSION BUILDING MISCELLANEOUS AREA HVAC SYSTEM SHEET 4 OF 4 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM INSTRUMENT AIR SYSTEM SHEET 1 OF 2 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM INSTRUMENT AIR SYSTEM | 5/26/2022 |
OXIDE POWDER HANDLING SYSTEM P&ID - HOPPER 1 LOADOUT | 5/26/2022 |
OXIDE POWDER HANDLING SYSTEM P&ID - HOPPER 2 LOADOUT | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM PROCESS CHILLED WATER SYSTEM | 5/26/2022 |
PROCESS OFF-GAS SCRUBBER SYSTEM P&ID LINE 1 KOH SCRUBBER TK-600/SB-600 | 5/26/2022 |
PROCESS OFF-GAS SCRUBBER SYSTEM P&ID LINE 1 KOH SCRUBBER TK-601/SB-601 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT RISER DIAGRAM CONVERSION BUILDING POTABLE WATER SYSTEM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM STEAM SUPPLY SYSTEM SHEET 1 OF 4 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM STEAM SUPPLY SYSTEM SHEET 2 OF 4 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM STEAM SUPPLY SYSTEM SHEET 3 OF 4 | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM STEAM SUPPLY SYSTEM SHEET 4 OF 4 | 5/26/2022 |
DUF6 CONVERSION PROJECT PRESSURE TRANSMITTER CALIBRATION CART SPECIAL TOOL PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
DUF6 CONVERSION PROJECT DUF6 VACUUM PUMP PMT CART SPECIAL TOOL P&ID | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM NITROGEN SUPPLY SYSTEM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM DEIONIZED WATER SYSTEM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT DEIONIZED WATER SYSTEM PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENTATION DIAGRAM HVAC SYSTEM - KOH REGENERATION BUILDING | 5/26/2022 |
PADUCAH DUF6 CONVERSION PROJECT RISER DIAGRAM WAREHOUSE/MAINTENANCE BUILDING POTABLE WATER SYSTEM | 5/26/2022 |
DUF6 CONVERSION PROJECT HF FLUSHING/TESTING SPECIAL TOOL CONFIGURATION P&ID | 5/26/2022 |
DUF6 Cylinder Information By Site Model Category 2-9-2022 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT FIRE WATER SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 1 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT FIRE WATER SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 2 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT PROCESS FLOW DIAGRAM PHG250 HYDROGEN SUPPLY SYSTEM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HYDROGEN SUPPLY SYSTEM PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT PIPING AND INSTRUMENT DIAGRAM PHG250 HYDROGEN SUPPLY SYSTEM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT 480V UNIT SUBSTATIONS ONE LINE DIAGRAM A1 AND A2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT 480V UNIT SUBSTATIONS ONE LINE DIAGRAM B1 AND B2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT 480V MOTOR CONTROL CENTER ONE LINE DIAGRAM A12 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT 480V MOTOR CONTROL CENTER A22 ONE LINE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT 480V MOTOR CONTROL CENTER A23 ONE LINE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT 480V MOTOR CONTROL CENTER B12 ONE LINE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT 480V MOTOR CONTROL CENTER B22 ONE LINE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT PDP-A1-2 AND PDP-A2-1 ONE LINE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT TRAILER POWER SWITCHRACK INSTALLATION DETAIL AND ONE-LINE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT MISCELLANEOUS POWER PANEL X-0-MPS-MP-B14EA-1 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT PROCESS FLOW DIAGRAM PROCESS CHILLED WATER SYSTEM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT POTABLE WATER SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 1 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT POTABLE WATER SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 2 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT SERVICE WATER SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 1 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT SERVICE WATER SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 2 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT SERVICE WATER SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 3 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT SERVICE WATER SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 4 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT UPS ONE LINE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT UPS SCHEDULE DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM - ADMINISTRATION BUILDING PIPING & INSTRUMENTATION DIAGRAM SHEET 1 OF 3 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM - ADMINISTRATION BUILDING PIPING & INSTRUMENTATION DIAGRAM SHEET 2 OF 3 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM - ADMINISTRATION BUILDING PIPING & INSTRUMENTATION DIAGRAM SHEET 3 OF 3 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT POTABLE WATER SYSTEM RISER DIAGRAM ADMINISTRATION BUILDING | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT UNINTERRUPTIBLE POWER SUPPLY UPS POWER PANEL MP-002-1 ADMINSTRATION BUILDING | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CLOSED COOLING WATER SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 2 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 1 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 2 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 3 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 4 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 5 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 6 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 7 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 8 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT CONVERSION BLDG PROCESS AREA HVAC SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 9 OF 9 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM -CONVERSION BLDG OFFICE AREA PIPING AND INSTRUMENTATION DIAGRAM SHEET 1 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM -CONVERSION BLDG OFFICE AREA PIPING AND INSTRUMENTATION DIAGRAM SHEET 2 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM -CONVERSION BLDG MISC AREA PIPING AND INSTRUMENTATION DIAGRAM SHEET 1 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM -CONVERSION BLDG MISC AREA PIPING AND INSTRUMENTATION DIAGRAM SHEET 2 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM -CONVERSION BLDG MISC AREA PIPING AND INSTRUMENTATION DIAGRAM SHEET 3 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM -CONVERSION BLDG MISC AREA PIPING AND INSTRUMENTATION DIAGRAM SHEET 4 OF 4 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT INSTRUMENT AIR SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 1 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT INSTRUMENT AIR SYSTEM PIPING AND INSTRUMENTATION DIAGRAM SHEET 2 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT PROCESS CHILLED WATER SYSTEM PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT POTABLE WATER SYSTEM RISER DIAGRAM CONVERSION BLDG. SHEET 1 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT POTABLE WATER SYSTEM RISER DIAGRAM CONVERSION BLDG. SHEET 2 OF 2 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT STEAM SUPPLY SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 1 OF 3 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT STEAM SUPPLY SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 2 OF 3 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT STEAM SUPPLY SYSTEM PIPING AND INSTRUMENATION DIAGRAM SHEET 3 OF 3 | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HF STORAGE SYSTEM PIPING AND INSTRUMENTATION DIAGRAM HF SPILL CONTAINMENT | 5/26/2022 |
DUF6 CONVERSION PROJECT HFS CONDUCTIVITY TESTER ASSEMBLY | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT NITROGEN SUPPLY SYSTEM PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT DEIONIZED WATER SYSTEM PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT HVAC SYSTEM - KOH REGENERATION BLDG PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT KOH REGENERATION SYSTEM PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT KOH REGENERATION SYSTEM PIPING AND INSTRUMENTATION DIAGRAM | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT KOH REGENERATION SYSTEM PIPING AND INSTRUMENTATION DIAGRAM MANIFOLD | 5/26/2022 |
PORTSMOUTH DUF6 CONVERSION PROJECT POTABLE WATER SYSTEM RISER DIAGRAM WAREHOUSE/MAINTENANCE BUILDING | 5/26/2022 |
GEL Laboratories Uranium Oxide Sampling Correspondence | 5/26/2022 |
Paducah Data Review Summary for Tank 551 | 5/26/2022 |
Paducah Data Review Summary for Tank 554 | 5/26/2022 |
PPPO Approval of Portsmouth ICS Upgrade Final Design Submission | 5/26/2022 |
Fluctuations in Production at the Portsmouth and Paducah DUF6 Conversion process 3-10-22b | 5/26/2022 |
Spare Parts List as of 2-23-22 | 5/26/2022 |
Pilot Oxide Management Plan | 6/13/2022 |
CTS 2021 Annual System Health Report | 6/23/2022 |
DUF6-U-PEP-1306 Assessing System Health | 6/23/2022 |
DUF6-U-PEP-1306-F01 Basis for Assessing System Health | 6/23/2022 |
DUF6-U-PEP-1306-F01-A Basis for Assessing System Health - Attachment A | 6/23/2022 |
DUF6-U-PEP-1306-F02 System Walk Down Report | 6/23/2022 |
DUF6-U-PEP-1306-F02-A System Walk Down Datasheet - Attachment A | 6/23/2022 |
DUF6-U-PEP-1306-F03 System Health Report | 6/23/2022 |
SHR-X-CON-1300-010-21 | 6/23/2022 |
SHR-X-CTS-1300-010-21 | 6/23/2022 |
SHR-X-FWS-1300-010-21 | 6/23/2022 |
SHR-X-HFR-1300-009-21 | 6/23/2022 |
SHR-X-HFS-1300-009-21 | 6/23/2022 |
SHR-C-CON-1300-001-20 - CY 2020 CON System annual SHR | 6/23/2022 |
SHR-C-FWS-1300-012-21 (ANNUAL) | 6/23/2022 |
6-23-22/SHR-C-HFR-1300-001-22 (ANNUAL) | 6/23/2022 |
6-23-22/SHR-C-HFS-1305-001-22 (ANNUAL) | 6/23/2022 |
SHR-C-ICS-1300-003-22 | 6/23/2022 |
SWR-X-CON-1300-005-22 | 6/23/2022 |
SWR-X-CTS-1300-005-22 | 6/23/2022 |
SWR-X-FWS-1300-005-022 | 6/23/2022 |
SWR-X-HFR-1300-005-22 | 6/23/2022 |
SWR-X-HFS-1305-005-22 | 6/23/2022 |
SWR-X-ICS-0000-005-2022 | 6/23/2022 |
SWR-X-VAP-1300-005-22 | 6/23/2022 |
VAP 2021 Annual System Health Report | 6/23/2022 |
SWR-C-ICS-1300-004-22 | 6/23/2022 |
SWR-C-VAP-1300-005-22 | 6/23/2022 |
SHR-X-ICS-0000-001-2021 | 6/23/2022 |
SHR-X-ICS-0000-012-2021 | 6/23/2022 |
SHR-X-VAP-1300-010-21 | 6/23/2022 |
SWR-C-CON-1300-005-22 | 6/23/2022 |
SWR-C-CTS-1300-005-22 | 6/23/2022 |
SWR-C-FWS-1300-005-22 | 6/23/2022 |
SWR-C-HFR-1300-005-22 | 6/23/2022 |
SWR-C-HFS-1305-005-22 | 6/23/2022 |
SWR-C-ICS-1300-003-22 | 6/23/2022 |
SWR-C-ICS-1300-004-22 upl | 6/23/2022 |
Collective Bargaining Agreement |
MCS USW Pad CBA | 2/1/2022 |
MCS USW Port | 2/1/2022 |
Miscellaneous |
MCS Small Business Goal Achievements | 2/14/2022 |
PPPO Contract Data (Incumbent Contracts, Award Fee Determinations & PEMPs) | 2/14/2022 |
PPPO Historical Community Commitment | 2/15/2022 |
UF6 Cylinder Information |
DOE UF6 Cylinder Information Database - Depleted 6.15.22.pdf | 6/15/2022 |
DOE UF6 Cylinder Information Database - Empty 6.15.22 | 6/15/2022 |
DOE UF6 Cylinder Information Database - LEU 6.15.22 | 6/15/2022 |
DOE UF6 Cylinder Information Database - Normal 6.15.22 | 6/15/2022 |
DOE UF6 Cylinder Information Database - Totals 6-15-22 | 6/15/2022 |
|