Anticipated Early Site Preparation to be Performed by Others
Phase I Geotechnical Characterization Report (note that this document is now RFP Section J Attachment J-14)
Phase II Geotechnical Characterization Report (note that this document is now RFP Section J Attachment J-15)
Subsurface Profiles (note that this document is now RFP Section J Attachment J-13)
Record of Decision
Construction Labor Agreement – DOE Oak Ridge – Effective 1 JAN 2018
Mercury Treatment Facility Video - For Informational Purposes Only
Section H Clause Annual Payroll and Residency Report Sample Instructions – UPDATED JAN 2018 VERSION
Section H Clause Annual Payroll and Residency Report Sample Format – UPDATED JAN 2018 VERSION
For Illustrative Purposes Only - Outfall 200 Mercury Treatment Facility Early Site Preparation Activities Storm Water Pollution Prevention Plan (SWPPP)
MOA For Site Use
Attachment J-2 Drawings – Reduced File Size – Index of Files
Reference Drawings Portfolio – FOR REFERENCE ONLY – NOT YOUR SCOPE – Early Site Preparation Contractor Scope
Waste Profile No. S-010 Construction-Demolition Waste
Waste Item Description UCN 2109 Form
OF200 Headworks Facility 3D Model – For Illustrative Purposes Only
OF200 Treatment Plant Facility 3D Model – For Illustrative Purposes Only
9720-8 Slab and Foundation Drawings - For Informational Purposes Only
OF200 MTF Y-12 Landfill Route Map - For Informational Purposes Only
Contractors Signatory to the Construction Labor Agreement Jan 2018
EM Quality Assurance Program (QAP) EM-QA-001 Rev. 1
Quality Assurance Implementation Plan for OF200 MTF Balance of Construction Activities for CD 2-3
Overarching Construction Project Safety and Health Plan, Outfall 200 Mercury Treatment Facility
Overarching Construction Execution-Management Plan, Outfall 200 Mercury Treatment Facility
Lessons Learned - Operational Experience Summary
Lessons Learned - Project Interfaces for Alternative Acquisition
Lessons Learned - UPF Construction Support Building Interface
Lessons Learned - UPF Site Infrastructure Integration
Lessons Learned – SWPF Design Procurement and Construction – For Informational Purposes Only

Site Environmental Characterization Report
Report and Appendices A - D
Report and Appendices A - D
Appendix E - Data Verification-Validation Files
Outfall200_L4_Validation_Report
Y-12 Outfall 200 160-18504-1_transmittal
Y-12 Outfall 200 160-18504-2_transmittal
Y-12 Outfall 200 160-18570-1_transmittal
Y-12 Outfall 200 160-18570-2_transmittal
Y-12 Outfall 200 160-18571-1_transmittal
Y-12 Outfall 200 160-18590-1_transmittal
Y-12 Outfall 200 160-18591-1_transmittal
Y-12 Outfall 200 160-18591-2_transmittal
Y-12 Outfall 200 160-18613-1_transmittal
Y-12 Outfall 200 160-18632-1_transmittal
Y-12 Outfall 200 160-18633-1_transmittal
Y-12 Outfall 200 160-18633-2_transmittal
Y-12 Outfall 200 160-18638-1_transmittal
Y-12 Outfall 200 160-18639-1_transmittal
Y-12 Outfall 200 160-18640-1_transmittal
Y-12 Outfall 200 160-18646-1_transmittal
Y-12 Outfall 200 160-18646-2_transmittal
Y-12 Outfall 200 160-18646-3_transmittal
Y-12 Outfall 200 160-18665-1_transmittal
Appendix F - Level 2 Reports
J18504-1 UDS Level 2 Report Final Report
J18504-2 UDS Level 2 Report Final Report
J18521-1 UDS Level 2 Report Final Report
J18521-2 UDS Level 2 Report Final Report
J18570-1 UDS Level 2 Report Final Report
J18570-2 UDS Level 2 Report Final Report
J18571-1 UDS Level 2 Report Final Report
J18590-1 UDS Level 2 Report Final Report
J18591-1 UDS Level 2 Report Final Report
J18591-2 UDS Level 2 Report Final Report
J18613-1 UDS Level 2 Report Final Report
J18615-1 UDS Level 2 Report Final Report
J18615-2 UDS Level 2 Report Rev(1) Final Report
J18632-1 UDS Level 2 Report Final Report
J18633-1 UDS Level 2 Report Final Report
J18633-2 UDS Level 2 Report Final Report
J18638-1 UDS Level 2 Report Final Report
J18639-1 UDS Level 2 Report Final Report
J18640-1 UDS Level 2 Report Final Report
J18646-1 UDS Level 2 Report Final Report
J18646-2 UDS Level 2 Report Final Report
J18646-3 UDS Level 2 Report Final Report
J18665-1 UDS Level 2 Report Final Report
Appendix G -Level 4 Reports
J18504-1 Std_Tal_L4 Final Report
J18504-2 Std_Tal_L4 Final Report
J18521-1 Std_Tal_L4 Final Report
J18521-2 Std_Tal_L4 Final Report
J18570-1 Std_Tal_L4 Final Report


 
 