The following documents are considered to be sensitive and are included in the data CD. Please see the "Requesting Sensitive Data" tab on how to obtain these documents:

BWCS Form 5108 - DOE 48-Inch Diameter & CV UF6 Cylinder Inspection/Maintenance Check sheet and Instructions
BWCS Form 5114 - Monthly UF6 Cylinder Storage Yard Inspection Sheet (BWCS-U-CYP-0002)
BWCS-C-CYP-2415-F01 - Inspection Criteria for Oxide Cylinders
BWCS-C-CYP-2416-F02 - Empty or Heel Cylinder Inspection Criteria
BWCS-C-CYP-2426-F01 - Cold Pressure Check Data Sheet
BWCS-C-OPS-0507 - Cylinder Movement Operations
BWCS-X-CYP-2501 - Handling, Transportation, and Inspection of DOE 48-Inch UF6 Cylinders
BWCS-X-CYP-2502 - In-Storage Inspection of 30" & 48" DOE UF6 Cylinders
BWCS-X-CYP-2504 - Handling, Transportation, and Inspection of DOE 30-Inch UF6 Cylinders
BWCS-X-CYP-2505 - Transporting Uranium Oxide Cylinders
BWCS-X-CYP-2505-F02 - Inspection Criteria for Oxide Cylinders
BWCS-X-CYP-2513 - Inspection and Operation of UF6 Cylinder Handler or Straddle Carrier
BWCS-X-CYP-2520 - Portsmouth UF6 Cylinder Surveillance and Maintenance Program
UDS-U-SFD-664 - DOE UF6 Cylinder Information Database (CID) Software Functional Description
D-C-1300-GEN-0203-M - Conversion Building General Arrangement Ground Floor Vaporization and Powder Transfer Room
D-C-1300-GEN-0206-M - Conversion Building General Arrangement Floor Plan At El 126'-0"
D-C-1300-GEN-0207-M - Conversion Building General Arrangement Floor Plan At El 134'-6"
D-C-1300-GEN-0208-M - Conversion Building General Arrangement Roof Plan
D-C-1300-GEN-0209-M - Conversion Building General Arrangement Ground Floor Cylinder Transfer And Hot Shop
D-C-1300-GEN-0211-M - Conversion Building General Arrangement Second Floor Condenser Room And Conversion Room
D-C-1300-GEN-0212-M - Conversion Building General Arrangement Section A-A
D-C-1300-GEN-0213-M - Conversion Building General Arrangement Section B-B
D-X-1300-GEN-0202-M - Conversion Building General Arrangement Ground Floor Mechanical, Electrical RM and Misc Area
D-X-1300-GEN-0203-M - Conversion Building General Arrangement Ground Floor Vaporization & Powder Transfer Room
D-X-1300-GEN-0205-M - Conversion Building General Arrangement Second Floor Conversion Process Area and Exhaust Fan RM
D-X-1300-GEN-0206-M - Conversion Building General Arrangement Floor Plan at EL 126'-0"
D-X-1300-GEN-0207-M - Conversion Building General Arrangement Floor Plan at EL 134'-6"
D-X-1300-GEN-0208-M - Conversion Building General Arrangement Roof Plan
D-X-1300-GEN-0209-M - Conversion Building General Arrangement Ground Floor Cylinder Transfer and Hot Shop
D-X-1300-GEN-0211-M - Conversion Building General Arrangement Second Floor Condenser Room and Mechanical Room
D-X-1300-GEN-0212-M - Conversion Building General Arrangement Section A-A
D-X-1300-GEN-0213-M - Conversion Building General Arrangement Section B-B
DUF6-UDS-FDD-PADU - Paducah Facility Design Document
DUF6-UDS-FDD-PORT - Portsmouth Facility Design Document
DUF6-C-F-FHA-001 - Fire Hazards Analysis Paducah DUF6 Conversion Facility
DUF6-C-F-FHA-002 - Paducah DOE C-745 Cylinder Storage Yards Fire Hazards Analysis
DUF6-C-HAZ-001 - Paducah Cylinder Storage Yard Hazard Analysis
DUF6-X-F-FHA-001 - Portsmouth DUF6 Conversion Facility Fire Hazards Analysis
DUF6-X-F-FHA-002 - Portsmouth DOE X-745C & X-745E Cylinder Storage Yards Fire Hazards Analysis
DUF6-X-F-FHA-003 - Portsmouth DOE X-745G-1 Cylinder Storage Yards Fire Hazards Analysis
DUF6-X-HAZ-001 - Portsmouth Cylinder Storage Yards Hazard Analysis
BWCS Form 1307 - Daily Operator Round Sheets for Facility Support
BWCS Form 1902 - Facility Manager Checklist
BWCS Form 3744 - Operator Round Sheets
BWCS Form 5108 - DOE 48-Inch Diameter & CV UF6 Cylinder Inspection/Maintenance Check-sheet and Instructions
BWCS Form 5114 - Monthly UF6 Cylinder Storage Yard Inspection Sheet (BWCS-U-CYP-0002)
BWCS Form 5144 - Paducah Operations Daily Orders
BWCS Form 5145 - Portsmouth Cylinder Yard Plan of the Day Form
BWCS Form 9005 - Paducah Cylinder Storage Yard Facility Manager/Supervisor Daily Log
BWCS Form 9019 - Facility Manager and Supervisor Turnover Checklist
BWCS Form 9020 - X-1300 Operations Control Room Log
BWCS Form 9021 - BWCS Paducah Facility Manager and Shift Supervisor Narrative Log
BWCS Form 9022 - Conversion Building Facility Manager Log
BWCS-C-CYP-2415-F01 - Inspection Criteria for Oxide Cylinders
BWCS-C-CYP-2416-F02 - Empty or Heel Cylinder Inspection Criteria
BWCS-C-FSP-2006-F01 - Empty Railcar Return/Receipt Inspection Checklist
BWCS-C-FSP-2006-F02 - Railcar Inspection After Load out/Off-Site Shipment Checklist
BWCS-C-OPS-0110-F01 - Conversion Line 1 Warm Standby Mode Checklist
BWCS-C-OPS-0110-F05 - Conversion Line 1 Operation Mode Checklist
BWCS-C-OPS-0110-F10 - Autoclave Line 1 Warm Standby Mode Checklist
BWCS-C-OPS-0110-F14 - Autoclave Line 1 Operation Mode Checklist
BWCS-C-OPS-0110-F18 - HF Transfer Line Warm Standby Mode Checklist
BWCS-C-OPS-0110-F19 - HF Transfer Line Operation Mode Checklist
BWCS-C-OPS-0110-F20 - HF Storage Tank Area Warm Standby Mode Checklist
BWCS-C-OPS-0110-F21 - HF Storage Tank Area Operation Mode Checklist
BWCS-C-OPS-0110-F23 - Vaporization Room Operation Mode Checklist
BWCS-C-OPS-0110-F24 - Cylinder Evacuation Room Operation Mode Checklist
BWCS-C-OPS-0110-F25 - Scrubber Room Operation Mode Checklist
BWCS-C-OPS-0401-F01 - HF Sampling Checklist
BWCS-C-OPS-0402-F01 - HF Load out Checklist
BWCS-C-OPS-4501-F01 - Paducah Plant Shiftly Operator Round Sheet
BWCS-C-OPS-4501-F02 - Paducah Plant Weekly Operator Round Sheet
BWCS-C-OPS-4501-F03 - Paducah Plant Miscellaneous Operator Round Sheet
BWCS-C-OPS-4501-F04 - Paducah Production Support Daily Operator Round Sheet
BWCS-U-CON-0001-F03 - Facility Manager and Supervisor Turnover Checklist
BWCS-U-CON-0001-F07 - C-1300 Operations Control Room Log
BWCS-U-PEP-1306-F02 - System Walk down Report
BWCS-U-QAP-0009-F01 - DUF6 Field Oversight Report
BWCS-U-WMP-1002-F03 - Storage Area Inspection Checklist
BWCS-U-WMP-1002-F04 - Oxide Storage Area(s) Inspection Checklist
C-EAP-C1100 - Trailer Complex Site Map
C-EAP-C1300 - C-1300 Conversion Building
C-EAP-C1700 - Building C-1700 Warehouse
C-EAP-C755 - C-755 Trailer Complex Site Map
C-EAP-C755-T05 - C-755-T-05 C-755 Trailer Complex
DUF6-BWCS-PLN-001 - Project Management Plan
DUF6-BWCS-PLN-002 - Regulatory and Permitting Management Plan
DUF6-BWCS-PLN-003 - Project Quality Assurance Plan
DUF6-BWCS-PLN-004 - Conversion Product Management Plan
DUF6-BWCS-PLN-005 - Waste Management Plan
DUF6-BWCS-PLN-007 - Radiation Protection Program
DUF6-BWCS-PLN-009 - Nuclear Materials Control and Accountability Plan for Piketon
DUF6-BWCS-PLN-011 - Cylinder Surveillance and Maintenance Plan
DUF6-BWCS-PLN-014 - Conversion Facilities Operations and Maintenance Plan
DUF6-BWCS-PLN-015 - Document Control and Records Management Plan
DUF6-BWCS-PLN-019 - Risk Management Plan
DUF6-BWCS-PLN-024 - Fire Protection Program Description for the DUF6 Conversion Project
DUF6-BWCS-PLN-027 - Personnel Selection, Training, and Qualification Management Plan
DUF6-BWCS-PLN-030 - Asset Management Plan
DUF6-BWCS-PLN-031 - Pollution Prevention and Waste Minimization (P2WM) Plan
DUF6-BWCS-PLN-033 - Paducah Site Security Plan
DUF6-BWCS-PLN-035 - Site Security Plan
DUF6-BWCS-PLN-040 - Integrated Safety Management System Plan for Operations
DUF6-BWCS-PLN-044 - Paducah Emergency Management Plan
DUF6-BWCS-PLN-045 - Piketon Emergency Management Plan
DUF6-BWCS-PLN-047 - Sampling and Analysis Plan
DUF6-BWCS-PLN-055 - Waste Certification Program Plan
DUF6-BWCS-PLN-056 - Maintenance Implementation Plan
DUF6-BWCS-PLN-067 - Nuclear Materials Control and Accountability Plan for Paducah
DUF6-BWCS-PLN-074 - Worker Safety and Health Program
DUF6-BWCS-PLN-075 - HF Disposition, Process Safety Management and Risk Management Plan
DUF6-BWCS-PLN-079 - Paducah Storm Water Pollution Prevention and Best Management Practices Plan
DUF6-BWCS-PLN-080 - Piketon Storm Water Pollution Prevention and Best Management Practices Plan
DUF6-BWCS-PLN-117 - Paducah Groundwater Protection Plan
DUF6-BWCS-PLN-118 - Environmental Management System Plan
DUF6-BWCS-PLN-121 - Configuration Management Plan for Operations
DUF6-BWCS-PLN-130 - DUF6 Oversight Plan
DUF6-BWCS-PLN-135 - Real Property Asset Management Plan
DUF6-BWCS-PLN-137 - X-1305 HF Loadout Facility Emergency Packet
DUF6-BWCS-PLN-139 - Paducah DUF6 Facilities Access Control Plan
DUF6-BWCS-PLN-145 - BWCS Site Contractor Assurance System (CAS) Description
DUF6-BWCS-PLN-169 - Throughput Improvement Plan Team Charter
DUF6-BWCS-PLN-188 - Nuclear Criticality Safety Program for the DUF6 Conversion Project
BWCS-U-NSP-0001 - Safety Basis Documentation
DUF6-C-DSA-001 - Paducah DUF6 Conversion Facility Documented Safety Analysis,
DUF6-C-DSA-003 - Documented Safety Analysis for the DUF6 Conversion Facility C-745 UF6 Cylinder Storage Yards, Paducah, Kentucky
DUF6-C-TSR-002 - Technical Safety Requirements for the DUF6 Conversion Facility, Paducah, KY
DUF6-C-TSR-004 - Technical Safety Requirements for the DUF6 Conversion Facility C 745 UF6 Cylinder Storage Yards, Paducah, Kentucky
DUF6-G-M-STU-006 - RAM analysis
DUF6-U-SMP-005 - Safety Management Program Descriptions for the B&W Conversion Services, LLC DUF6 Conversion Project
DUF6-X-DSA-001 - Portsmouth DUF6 Conversion Facility Documented Safety Analysis
DUF6-X-DSA-003 - Documented Safety Analysis for the DUF6 Conversion Facility X-745C, X-745E, and X-745G-1 UF6 Cylinder Storage Yards, Piketon, Ohio
DUF6-X-TSR-002 - Technical Safety Requirements for the DUF6 Conversion Facility, Piketon, Ohio
DUF6-X-TSR-004 - Technical Safety Requirements for the DUF6 Conversion Facility X-745C, X-745E, and X 745G-1 UF6 Cylinder Storage Yards, Piketon, Ohio
DUF6-C-G-SDD-ETS - Paducah Effluent Treatment System
DUF6-C-M-SDD-FWS - System Design Description for Fire Protection and Detection System
DUF6-C-M-SDD-HVA - System Design Description for HVAC Systems
DUF6-G-E-SDD-PES - System Design Description for Plant Electrical System (PES)
DUF6-G-G-SDD-CMS - System Design Description Cylinder Modification System
DUF6-G-G-SDD-CON - Conversion System
DUF6-G-G-SDD-CSS - Cylinder Stabilization System
DUF6-G-G-SDD-CTS - Cylinder Transfer System
DUF6-G-G-SDD-ETS - Effluent Treatment System
DUF6-G-G-SDD-HFR - HF Recovery System
DUF6-G-G-SDD-HFS - HF Storage System
DUF6-G-G-SDD-KRS - KOH Regeneration System
DUF6-G-G-SDD-OPH - Oxide Powder Handling System
DUF6-G-G-SDD-POS- Process Off-Gas Scrubber System
DUF6-G-G-SDD-VAP - Vaporization System
DUF6-G-J-SDD-ICS - System Design Description - Integrated Control System (ICS)
DUF6-G-M-SDD-CCW - System Design Description for Closed Cooling Water System (CCW)
DUF6-G-M-SDD-HDS - System Design Description Hydrogen System
DUF6-G-M-SDD-PCW - System Design Description for Process Chilled Water (PCW)
DUF6-G-M-SDD-SSS - System Design Description for Steam Supply System (SSS)
DUF6-X-M-SDD-FWS - System Design Description for Fire Protection and Detection System
DUF6-X-M-SDD-HVA - System Design Description for HVAC Systems
DUF6-UDS-SRD-PROJ - Overall System Requirements Document
DUF6-UDS-SRD-PADU - Paducah System Requirements Document
DUF6-UDS-SRD-PORT - Paducah System Requirements Document
Paducah CBA -Collective Bargaining Agreement
Portsmouth CBA- Collective Bargaining Agreement

The following documents are considered to be sensitive and are included in the data CD sent to contractors on 10-29. Please see the "Requesting Sensitive Data" tab on how to obtain these documents:

Listing of DUF6 Project Documents PID October 2015 crossreferenced to question number
Listing of General DUF6 Proceedure and Project Documents

The following documents are considered to be sensitive and are included in the data CD sent to contractors on 11-4. Please see the "Requesting Sensitive Data" tab on how to obtain these documents:

List of DUF6 Project Equipment Specifications and Calculations October 2015




 
 
Services provided by:
 
Environmental Management Consolidated Business Center
250 E Fifth Street, Suite 500 | Cincinnati, OH 45202 | (877) 224-8181